M91 Labs

Dossier page 234

Verified Completion

Verified completion and the Command Transfer result are separate records. A filled page alone does not award a credential.

01What verification requiresIn this order

  1. Four checkpoints entered. Day 0, SITREP 30, SITREP 60 and Day 91, each entered at m91labs.com/index.
  2. Each one inside its window. SITREP 30 at least 25 days after Day 0. SITREP 60 at least 25 days after SITREP 30. Day 91 at least 85 days after Day 0 and within 120 days of it. Timing is taken from when each entry is received.
  3. A spot check of the book. After Day 91 the site names three days between 1 and 90. You photograph those three completed spreads and M91 Labs reviews them. You may cover your written reflections; the date and the Daily Command Pulse must be visible.

02What it awards

A verified completion record carrying your Operator ID and completion date, and a physical credential issued to verified operators.

Verification does not depend on your transfer result. An operator whose result reads Not Yet Transferred can still be verified complete: one record says the work was done, the other says what the telemetry showed.

03When it opens

Verification opens before the first operators reach Day 91. Nothing is needed from you until then except the work and the four checkpoints. If you have not registered Day 0, do that first at m91labs.com/index.

Used once, to tell you verification is open. Nothing else is collected here. Privacy